Job
Brand, color and tint are set once for the whole job, the same as on the paper form.
House outline
Stand in front of the house. Tap the front door to start, then tap each corner working to your right, all the way round until you are back where you began.
0Walls
0 ftPerimeter
0 sq ftFootprint
0Openings
Add openings
Opening schedule
Close the outline, then add each window and door from the wall it sits on.
Before this goes to the tech
Agreement
This engineering form is a legally binding extension to the Master Home Improvement Agreement. All openings approved on engineering.
Signature capture comes with the PDF step.
Creates the PDF and files it on the Salesforce opportunity. Salesforce isn’t connected yet, so for now this saves the survey on the iPad.